How it works
From first visit to finished room
Ten to twelve weeks from saying yes to sitting in it, and only two of those happen in your garden. Here is each step, how long it takes and when you pay.
- 10 to 12 weeks
- from your deposit to the handover.
- 8 to 10 days
- of that on site, for most rooms.
- 1 price
- fixed after the design visit, paid in four parts.
Step by step
Seven steps, and you only have to be there for three
You’re needed at the design visit, on the first morning and at the handover. The rest happens in our workshop or while you’re at work.
-
Price it yourself
Two minutes
Use the calculator to get a guide price for the size and extras you have in mind. It works from the same price list we quote from.
-
Design visit
About an hour, free
Elin or Mark comes to you. We measure up, look at the ground, the access and the route for the cable, and work out where the room should sit and which way it should face.
-
Drawings and a fixed quote
Within a week
You get an elevation, a plan and one price. It doesn’t change unless you change the design.
-
Planning check
Before you pay anything
We check your address against the planning rules and tell you in writing where you stand. If an application is needed, we make it.
-
Made in the workshop
Three to four weeks
Your floor, wall and roof panels are built and insulated indoors, out of the weather. You’re welcome to come and see them.
-
Built in your garden
Eight to ten working days
Ground screws on day one, watertight by day three, plastered by day seven. Our electrician connects it to the house and tests it.
-
Handover
The last afternoon
We walk round it with you, then hand over the keys, the electrical certificate and the guarantee.
On site
Nine days in your garden
This is how a Study goes up. The Nook takes a day less and The Studio two more. We work from eight until half past four, and not at weekends.
-
Day 1
Ground screws and floor
The screws are wound in with a hand-held machine and the floor is levelled on top of them.
-
Day 2
Walls and roof
The panels go up. By the evening it looks like a room.
-
Day 3
Watertight
Roof membrane on, door and window in. From here the weather doesn’t matter.
-
Days 4 and 5
Cladding and cables
Boards outside, wiring inside, and a narrow trench back to the house.
-
Days 6 and 7
Plaster
Boarded and skimmed, then a day to dry while we finish the trims outside.
-
Day 8
Paint and floor
Two coats on the walls, then the floor and skirting go down.
-
Day 9
Connection and handover
Our electrician connects the supply, tests it and certifies it. We clear up and give you the keys.
Paying for it
Four payments, the last one when you’re happy
The price is fixed in your quote. It’s split so that you’re never far ahead of the work, and we’re never far behind on the timber bill.
- 10%
- to book your slot. Returned in full if the planning check turns up a problem we can’t solve.
- 40%
- when your panels go into the workshop. About four weeks before we arrive.
- 40%
- on the first day on site. When the panels are in your garden.
- 10%
- at handover. Once you’ve walked round it and you’re happy.
Questions
What people ask before they book
- What can change the price?
- Three things, which is why the calculator gives a range. Access: carrying panels through a house takes longer than walking them down a drive. Ground: soft or sloping ground needs longer screws. And the cable: the first 20 m is included, and a longer run costs more. We measure all three at the design visit, and the fixed quote that follows doesn’t move.
- Why ten to twelve weeks, if it only takes nine days?
- Most of the wait is the queue. We put up one room at a time, about forty a year, and your panels go into the workshop three to four weeks before your slot. If you have a date in mind, tell us at the design visit and we’ll say straight away whether we can meet it.
- Do you build in winter?
- All year. The panels arrive finished, so the room is watertight by the third day whatever the weather is doing.
- Do I need to be at home?
- On the first morning and for the handover. In between we need a way into the garden and, for the first few days, somewhere to plug in.
- Will you take the old shed away?
- Yes, if you’d like. It goes into your fixed quote, and it’s usually a couple of hundred pounds.
- How long will it last?
- The structure is guaranteed for ten years and built to last several times that. Larch and cedar need no treatment to stay sound, and we come back after the first winter to check the doors and ease anything that has settled.
- Who actually builds it?
- We do. Mark and two joiners make the panels and put them up, and our own electrician does the wiring. Nothing is subcontracted except the plastering, and the plasterer has worked with us since 2016.
Next step
The first step takes two minutes
Price the room you have in mind. If the number looks right, book a design visit and we’ll take it from there.
- The Nook · 3.0 × 2.4 m
- from £14,600
- The Study · 4.0 × 3.0 m
- from £21,700
- The Studio · 5.4 × 3.6 m
- from £32,700
- All prices include
- VAT, foundations, electrics and installation